TO REGISTER CALL
1-800-682-6640

You may also register by email:
tc@simons-white.com
 

COURSE DURATION

HOURS: 8 A.M. - 4 P.M.
LENGTH: 1 Day
 

COURSE OBJECTIVES

Participants will be able to determine where controls are needed in a process and be able to document the controls to be used. They will also be able to participate on teams that are generating control plans.
 

WHO SHOULD ATTEND

Process Engineers, Product Engineers, Quality (All Types), Supervisors.

Control Plans

This workshop presents the basic concepts related to process variation, process control, the role of control plans in the product development process and relationship of APQP documents.

COURSE CONTENT

  • Control Plans

Introduction to Control Plans

  • What is a Control Plan?
  • When to Use a Control Plan
  • Why Use a Control Plan?
  • Types of Control Plans

 

Control Plan Methodology

  • Process Analysis Inputs
  • Process Documentation Inputs
  • Fishbone Diagram Linkage

 

Process Dominance

  • Climate Dominant Process
  • Maintenance Dominant Process
  • Component Dominant Process
  • Operator Dominant Process
  • Tooling Dominant Process
  • Fixture Dominant Process
  • Machine Dominant Process
  • Set-up Dominant Process

 

The Control Plan Form and Columns

  • Control Plan Top Section
  • Process Number
  • Operation Description
  • Manufacturing Device
  • Product Characteristics
  • Process Characteristics
  • Special Characteristics
  • Specifications and Tolerances
  • Measurement Technique
  • Sample Size and Frequency
  • Control Methods
  • Reaction Plan

 

1-800-682-6640 Need to reduce errors and improve performance? Call now to explore training and consulting solutions.

Simons-White & Associates, Inc. is certified to meet ISO 9000 standards.