TO REGISTER CALL
1-800-682-6640

You may also register by email:
tc@simons-white.com
 

COURSE DURATION

HOURS: 8 A.M. - 4 P.M.
LENGTH: 1 Day
 

COURSE OBJECTIVES

Participants will understand the steps and documents necessary for completing and submitting the PPAP.
 

WHO SHOULD ATTEND

Process Engineers, Product Engineers, Quality (All Types), Supervisors.

Production Part Approval Process (PPAP)

The purpose of the Production Part Approval Process is to determine if all customer specification requirements are properly understood and that processes have the potential to produce products meeting these requirements. The workshop covers the PPAP requirements as established by DaimlerChrysler, Ford and General Motors.

COURSE CONTENT

  • Production Part Approval Process (PPAP)

PPAP Definition and Overview of Concepts

Requirements for Part Approval

PPAP Linkage to Other Documents

  • Design and Process FMEAs
  • Control Plan
  • Preliminary Process Capability Studies and Product Samples
  • Preliminary Dimensional, Material, Appearance and Performance Studies

Submission Levels (1-5)

PPAP Components

  • Cover Report
  • Auxiliary Drawings and Sketches
  • Customer Identified Characteristics
  • Appearance Approval Report
  • Dimensional Result Report
  • Material Test report
  • Performance Test Report

Other Requirements

  • Required Sample Sizes
  • Documentation Retention
  • Extra Approvals
  • Retention of Samples
  • Testing Services
  • Shipment of Samples/Special Samples

1-800-682-6640 Need to reduce errors and improve performance? Call now to explore training and consulting solutions.

Simons-White & Associates, Inc. is certified to meet ISO 9000 standards.